Beaches Energy Services Solar & Net Metering Guide
Last updated: 2026-05-17 by Goldin Solar permitting team
Beaches Energy Services is a municipal electric utility operated by the City of Jacksonville Beach that serves the three Duval County beach cities — Jacksonville Beach, Neptune Beach, and Atlantic Beach — plus a portion of Ponte Vedra Beach in northern St. Johns County. Beaches Energy is administratively independent of JEA (which serves the rest of Duval and the City of Jacksonville).
Who Beaches Energy serves
Beaches Energy’s service territory covers:
- Jacksonville Beach — all addresses
- Neptune Beach — all addresses
- Atlantic Beach — all addresses
- Ponte Vedra Beach — northern St. Johns County portion (Beaches Energy serves part of Ponte Vedra in northern St. Johns)
Beaches Energy is NOT JEA. JEA serves City of Jacksonville and most of Duval. Beaches Energy is the muni for the three beach cities. This is a common Duval County customer confusion point.
If you’re a Beaches Energy customer, your net metering tariff is set by the Jacksonville Beach city council / Beaches Energy board, not the FL Public Service Commission.
Beaches Energy net metering: the basics
- Eligibility: Customer-sited residential PV at premises within Beaches Energy territory
- System size cap: Beaches Energy offers standard interconnection agreements at three tiers — Tier 1 (≤10 kW), Tier 2 (>10–100 kW), Tier 3 (>100 kW–2 MW)
- Bill credit structure: Per current tariff
- Bill credit / settlement: Excess generation is credited under Beaches Energy’s net-metering / power-purchase agreement with annual settlement; the residential energy rate is about 14.96¢/kWh. Confirm the current credit basis on the member agreement at quote time
- Interconnection application: Required before installation
- PTO process: Beaches Energy-managed meter swap and PTO
What makes Beaches Energy different from JEA / FPL
- Municipal governance. Beaches Energy’s tariff is set by the Jacksonville Beach city/board structure.
- Small muni scale. Different staffing and interconnection queue dynamics than JEA.
- Beachfront concentration. All service is within ~1 mile of Atlantic Ocean — salt-air corrosion considerations apply.
- Beaches Energy ≠ JEA. Verify from your power bill.
Permit + utility coordination for Beaches Energy customers
1. Building permit with Jacksonville Beach, Neptune Beach, Atlantic Beach, or St. Johns County (Ponte Vedra) as applicable 2. Beaches Energy interconnection application — submitted in parallel 3. HOA / ARC approval if applicable 4. Installation after permit issuance 5. Final inspection by the building department 6. Beaches Energy meter swap after final inspection 7. PTO grant
Typical Beaches Energy timeline
End-to-end: typically 7 to 11 weeks.
What we’ve learned working with Beaches Energy
- Salt-air corrosion is universal. Stainless or premium-coated fasteners are standard on every Beaches Energy install.
- Three city permitting overlay. Beaches Energy serves three different cities — building permit AHJ varies by exact address.
- Battery + solar is supported.
- Beaches Energy ≠ JEA. Verify from power bill before assuming JEA for Duval.
Frequently asked questions
Is Beaches Energy net metering as good as JEA / FPL? Different structure. We model your specific case.
Am I on Beaches Energy or JEA? Beaches Energy = Jacksonville Beach + Neptune Beach + Atlantic Beach + Ponte Vedra. JEA = rest of Duval. Verify from your power bill.
Salt-air corrosion — what’s the hardware impact? Stainless or marine-grade fasteners standard. Premium racking sometimes warranted.
Battery + solar — supported? Yes. Additional ESS documentation.
Does Goldin Solar handle Beaches Energy interconnection paperwork? Yes — included on every Beaches Energy contract at no additional charge.
Talk to a Beaches Energy solar specialist
Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300
Get a free Beaches Energy solar quote
Related guides: Solar permits in Duval County / Jacksonville · Solar permits in St. Johns County · JEA net metering