Sumter Electric Cooperative (SECO) Solar & Net Metering Guide

Last updated: July 13, 2026 by Goldin Solar

Sumter Electric Cooperative — universally known as SECO — is a member-owned electric cooperative serving central Florida from its Sumterville headquarters. SECO is the dominant utility for The Villages (the largest 55+ retirement community in the United States) and serves substantial portions of Sumter, Lake, Marion, Pasco, Hernando, Citrus, and Levy counties. As a member-owned cooperative, SECO’s net metering program is governed by the SECO board, not the Florida Public Service Commission.

Who SECO serves

SECO’s service territory covers parts of:
Sumter County — most of it (including most Villages addresses)
Lake County — substantial coverage (including northern Villages addresses)
Marion County — substantial coverage (including northwestern Villages addresses)
Pasco County — limited rural eastern Pasco coverage
Hernando County — substantial coverage
Citrus County — substantial coverage
Levy County — limited eastern service
Lake, Marion, Sumter — coverage confirmed; SECO serves portions of all 7 counties

SECO is NOT Duke, FPL, TECO, or any other Florida utility. If you’re served by SECO, your meter swap and net metering tariff all run through SECO directly.

SECO net metering: the basics

As a member-owned cooperative, SECO operates under cooperative-governance principles rather than state PSC regulation:

What makes SECO different from Duke / FPL

Permit + utility coordination for SECO customers

  1. Building permit (jurisdiction varies — see our county/city-specific guides)
  2. SECO interconnection application — submitted in parallel
  3. HOA / ARC approval (Villages ARC if applicable)
  4. Installation after permit issuance
  5. Final inspection by the building department
  6. SECO meter swap after final inspection
  7. SECO PTO grant

Typical SECO timeline

Stage Typical days
Building permit + SECO application 14-30 (parallel)
Installation execution 1-2 days
Final inspection 3-10
SECO meter swap + PTO 28–56 days typical; confirm current queue with SECO

What we’ve learned working with SECO

Frequently asked questions

Is SECO net metering as good as Duke / FPL?
Different structure. We model your specific case against current SECO tariff.

What system size can I install on SECO?
Typically sized to 100% of historical annual usage. Confirm current SECO NEM cap at application.

Does SECO charge a monthly fee for net metering customers?
Read the current SECO tariff; confirm any NEM-specific monthly customer charge at application.

Can I install batteries with my SECO solar system?
Yes. Additional documentation for the ESS portion.

Does Goldin Solar handle SECO interconnection paperwork?
Yes — included on every SECO-area contract at no additional charge.

Talk to a SECO solar specialist

Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300

Get a free SECO solar quote


Related guides: Solar permits in Sumter County / The Villages · Solar permits in Lake County · Solar permits in Marion County · Duke Energy net metering (for comparison)


Credentials


Author + dates



Request for Service.