Bartow Electric is the municipal electric utility for the City of Bartow in Polk County. Bartow Electric is one of several Polk County electric utilities — administratively distinct from Duke Energy (which serves most of Polk), Lakeland Electric (which serves Lakeland and adjacent areas), and Tampa Electric (TECO) (which serves a portion of western Polk). Bartow Electric’s service is concentrated within Bartow city limits.

Who Bartow Electric serves

Bartow Electric’s service territory covers:

Bartow Electric is NOT Duke and NOT Lakeland Electric. Polk County hosts multiple electric utilities — verify from your power bill.

If you’re a Bartow Electric customer, your net metering tariff is set by the Bartow city commission, not the FL Public Service Commission.

Bartow Electric net metering: the basics

Florida law (§366.91, F.S.) requires every municipal electric utility — Bartow Electric included — to offer net metering and a standardized interconnection agreement for customer-owned renewable generation, and Bartow Electric does offer net metering. Bartow does not publish its specific net-metering rate terms in any public, machine-readable source: the City of Bartow’s official electric tariff schedule contains no net-metering or customer-generation provisions (verified against the full tariff document 2026-06-14), and the terms are set administratively by the Bartow city commission. We confirm the exact figures directly with Bartow Electric for each project.

Because Goldin Solar handles every Bartow interconnection application in-house, we obtain and apply the current Bartow Electric net-metering terms directly from the utility for your specific address — you do not need to track down the tariff yourself.

What makes Bartow Electric different from Duke / Lakeland Electric

Permit + utility coordination for Bartow customers

1. Building permit with the City of Bartow building department 2. Bartow Electric interconnection application — submitted in parallel 3. HOA / ARC / historic-review approval if applicable 4. Installation after permit issuance 5. Final inspection by the building department 6. Bartow Electric meter swap after final inspection 7. PTO grant

Typical Bartow Electric timeline

End-to-end: typically 8 to 12 weeks (historic-district extends timeline).

What we’ve learned working with Bartow Electric

Frequently asked questions

Is Bartow Electric net metering as good as Duke? Different structure. We model your specific case.

Am I on Bartow, Duke, Lakeland Electric, TECO, or SECO? Verify from your power bill — Polk County has multiple utilities.

Battery + solar — supported? Yes. Additional ESS documentation.

Does Goldin Solar handle Bartow interconnection paperwork? Yes — included on every Bartow contract at no additional charge.

Talk to a Bartow Electric solar specialist

Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300

Get a free Bartow solar quote


Related guides: Solar permits in Polk County · Duke Energy net metering · Lakeland Electric net metering



Request for Service.