The Town of Davie is a central Broward County municipality west of Hollywood and south of Plantation. Davie is unusual among Broward cities for its semi-rural / equestrian residential character — many Davie residential lots are zoned for horses, with large-lot ranch-style residential and significant agricultural overlay. Davie sits inside HVHZ. Davie building permitting is administered by the Town of Davie Building Department.
Davie-specific solar permit considerations
- HVHZ jurisdiction. Miami-Dade NOA hardware required on every install.
- Equestrian / agricultural overlay. Davie has substantial agricultural and equestrian zoning. Large lots open up ground-mount feasibility that’s uncommon in most of Broward.
- Barn / outbuilding interconnection. Davie residential often includes barns, riding rings, and outbuildings; sometimes a sub-panel feeds these, and PV interconnection point selection requires careful review.
- HOA presence is mixed. Older equestrian Davie has no HOA; newer suburban Davie (Forest Ridge, Long Lake Ranches) has ARCs.
- No salt-air exposure. Davie is inland.
Utility coordination
FPL is the utility for Davie.
Permit + utility coordination flow
- Building permit with Town of Davie — HVHZ submittal requirements apply
- FPL interconnection application — submitted in parallel
- HOA / ARC approval if applicable
- Installation after permit issuance
- Final inspection by Town of Davie
- FPL meter swap after final inspection
- PTO grant
Typical Davie timeline
End-to-end: typically 9 to 13 weeks.
What we’ve learned working in Davie
- Ground-mount feasibility on equestrian lots — uncommon for the rest of Broward.
- Sub-panel + barn interconnection requires careful one-line diagram.
- HVHZ NOA hardware on every install.
- Battery + solar widely supported.
Frequently asked questions
Equestrian property — ground-mount feasible?
Often yes. Davie’s larger lots support ground-mount where rooftop is constrained.
My Davie home has a barn — can it share solar?
Yes; we route interconnection at the main panel or service entrance.
Davie — HVHZ?
Yes. Miami-Dade NOA hardware required.
Am I on FPL?
Davie is FPL. Verify from your power bill.
Battery + solar — supported?
Yes. Additional ESS documentation.
Does Goldin Solar handle HVHZ + FPL paperwork?
Yes — included on every Davie contract at no additional charge.
Talk to a Davie solar specialist
Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300
Related guides: Solar permits in Broward County · Solar permits in Plantation · Solar permits in Cooper City · FPL net metering