Talquin Electric Cooperative Solar & Net Metering Guide

Last updated: July 13, 2026 by Goldin Solar

Talquin Electric Cooperative is a member-owned electric cooperative serving the Big Bend region of the Florida Panhandle. Talquin’s service territory covers portions of Leon, Gadsden, Liberty, and Wakulla counties — most of unincorporated Leon County around Tallahassee (the City of Tallahassee itself is served by Tallahassee Utilities municipal), Gadsden, and the rural Big Bend.

Who Talquin serves

Talquin’s Big Bend footprint covers:
Leon County — unincorporated areas surrounding Tallahassee (Tallahassee city limits are served by Tallahassee Utilities)
Gadsden County — primary utility for Quincy, Havana, Gretna, and most of the county
Liberty County — primary utility for Bristol and rural Liberty
Wakulla County — primary utility for Crawfordville and rural Wakulla

If you’re a Talquin member, your meter swap and net metering tariff run through Talquin directly — not Tallahassee Utilities and not Duke.

Talquin net metering: the basics

What makes Talquin different from Tallahassee Utilities / Duke

Permit + utility coordination for Talquin members

  1. Building permit with the relevant county building department
  2. Talquin interconnection application — submitted in parallel
  3. HOA / ARC approval if applicable
  4. Installation after permit issuance
  5. Final inspection by the building department
  6. Talquin meter swap after final inspection
  7. PTO grant

Typical Talquin timeline

Stage Typical days
Building permit + Talquin application 14-30 (parallel)
Installation execution 1-2 days
Final inspection 3-10
Meter swap + PTO 28–49 days typical; confirm current queue with Talquin

What we’ve learned working with Talquin

Frequently asked questions

Is Talquin net metering as good as Tallahassee Utilities?
Different structures, both board-set (Talquin’s by cooperative board, TU’s by city commission). We model your specific case.

Tree canopy on my Big Bend home — viable?
We do drone shade analysis. Honest assessment up front.

Battery + solar — supported?
Yes. Additional ESS documentation.

Does Goldin Solar handle Talquin interconnection paperwork?
Yes — included on every Talquin contract at no additional charge.

Talk to a Talquin solar specialist

Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300

Get a free Talquin solar quote


Related guides: Solar permits in Leon County / Tallahassee · Tallahassee Utilities net metering


Credentials


Author + dates



Request for Service.