LCEC (Lee County Electric Cooperative) Solar & Net Metering Guide

Last updated: July 13, 2026 by Goldin Solar

LCEC — Lee County Electric Cooperative — is one of Florida’s largest electric cooperatives. Despite the name (referencing Lee County, where it was founded in 1940), LCEC serves portions of five southwest Florida counties: Lee, Collier, Hendry, Charlotte, and Broward (Everglades portion). LCEC is the dominant utility for Cape Coral, Sanibel, Pine Island, Captiva, and much of unincorporated Lee County — and a major utility for Marco Island and parts of Collier.

Who LCEC serves

LCEC’s southwest Florida footprint covers:
Lee County — Cape Coral, Sanibel, Captiva, Pine Island, North Fort Myers, much of unincorporated Lee
Collier County — Marco Island, Immokalee, much of east/rural Collier
Hendry County — parts of LaBelle and Felda areas
Charlotte County — parts of southern/eastern Charlotte
Broward County — small Everglades-area service

This is one of Florida’s largest cooperative service areas. If you’re an LCEC member, your net metering tariff is governed by the LCEC board, not the FL Public Service Commission.

LCEC net metering: the basics

What makes LCEC different from FPL / Duke

Permit + utility coordination for LCEC members

  1. Building permit with the relevant county/city building department
  2. LCEC interconnection application — submitted in parallel
  3. HOA / ARC approval if applicable
  4. Installation after permit issuance
  5. Final inspection by the building department
  6. LCEC meter swap after final inspection
  7. PTO grant

Typical LCEC timeline

Stage Typical days
Building permit + LCEC application 14-30 (parallel)
Installation execution 1-2 days
Final inspection 5-14 (post-Ian beach areas longer)
Meter swap + PTO 28-56

What we’ve learned working with LCEC

Frequently asked questions

Is LCEC net metering as good as FPL?
Different structure. We model your specific case.

My Sanibel/Captiva/Pine Island home — different process?
Yes — NOA hardware + post-Ian rebuild verification. We’ve worked with LCEC on Ian-rebuild interconnection.

Cape Coral solar — typical install?
Yes; LCEC’s Cape Coral process is well-developed.

Marco Island — LCEC or FPL?
LCEC for most of Marco Island. Verify from your power bill.

Battery + solar — supported?
Yes. Additional ESS documentation.

Does Goldin Solar handle LCEC interconnection paperwork?
Yes — included on every LCEC contract at no additional charge.

Talk to an LCEC solar specialist

Goldin Solar, LLC · 1105 US Highway 1, Vero Beach, FL 32960 · (855) 765-2730 · CVC 57300

Get a free LCEC solar quote


Related guides: Solar permits in Lee County · Solar permits in Collier County · Solar permits in Hendry County


Credentials


Author + dates



Request for Service.